STILTED GROUND FIRST SECOND THIRD FLOOR RESIDENTIAL AREA KEY PLAN MIXED GROUND FLOOR COMMERCIAL AREA KEY PLAN Stamps of Approval of plan Signature Not Verified 11.8 0.3 0.3 FSI AREA BALCONY (15%) TERRACE (20%) LIFT TOTAL 2.1 2.40.5 0.7 BUILT UP AREA CALCULATION 3.4 5.5 3.4 BUILDING FLOORS COMM. RESI. IND. SPECIAL MEZZ. PERM. PROP. EXCESS PERM. PROP. EXCESS FSIAREA MIXED BASEMENT 0 52.18 0 0 0 7.83 0 0 10.44 0 0 0 52.18 FOR GROUND FLOOR COMMERCIAL 0.8 D-1 BAL1 BAL0 D-2 0.8 MIXED GROUND FLOOR 55.69 0 0 0 0 0 0 0 0 0 0 0 55.69 0.2 AREA NAME LENGTH WIDTH Area(Sq.M) MIXED STILTED GROUND FIRST SECOND THIRD 0 FLOOR 553.32 0 0 0 83 31.84 0 110.66 0 0 9 553.32 2.8 BLOCK 11.45 15.5 177.48 D2 FLOOR WISE BUILT UP AREA - Total MIXED 55.69 605.5 0 0 0 90.83 31.84 0 132.24 0 0 9 661.19 BLOCK AREA TOTAL =177.48Sq.M Digitally signed by SUDHAKAR VISHNU DESHMUKH 5.2 B/up Area Total Tene. Total Tene. Total Tene. 1.4 DEDUCTION FLOORS Flat No. Flat Type + Bal. In Sq.Mt Above 80 40 To 80 Up To 40 D-1 --> --> 114.71 STILTED GROUND FIRST SECOND 4 THIRD FLOOR 3 2BHK 2BHK 31.5 31.52 0 0 16 1.2 SC(P)0 --> --> 7.08 Date: 2019.05.24 12:32:22 IST 2 1 2BHK 2BHK 31.52 31.52 2.5 SC(P)0 D-1 LIFT(R)0 TOTAL =121.79Sq.M Total Deduction =121.79Sq.M Reason: Approved Drawing Plan GROUND FLOOR BASEMENT 1 1 SHOP HS 52.3 49.3 0 0 0 1 0 0 15.5 Net BuiltUp Area=55.69Sq.M Location: Dhule Municipal Corporation 17 5 D-6 SC(P)0 PASS(P)0 LIFT(R)0 D-3 5.1 17 1.2 TOTAL 0 1 16 16.1 BUILT UP AREA CALCULATION CARPET AREA CALCULATIONS CARPET AREA CALCULATIONS CARPET AREA CALCULATIONS CARPET AREA CALCULATIONS FOR STILTED GROUND FIRST SECOND THIRD FLOOR RESIDENTIAL EXCLUDING OPEN BALCONY & TERRACES EXCLUDING OPEN BALCONY & TERRACES EXCLUDING OPEN BALCONY & TERRACES EXCLUDING OPEN BALCONY & TERRACES 4.2 AREA NAME LENGTH WIDTH Area(Sq.M) FLAT NOS ROOMS AREA CARPET AREA FLAT NOS ROOMS AREA CARPET AREA FLAT NOS ROOMS AREA CARPET AREA FLAT NOS ROOMS AREA CARPET AREA 2BHK-4 KITCHEN 6.33 49.68 2BHK-3 KITCHEN 6.33 49.68 2BHK-2 KITCHEN 6.33 49.68 2BHK-1 KITCHEN 6.33 49.68 BLOCK 12.35 16.97 209.52 HALL 9.51 HALL 9.51 HALL 9.51 HALL 9.51 BLOCK AREA TOTAL =209.52Sq.M 5.2 5.2 HALL 9.51 HALL 9.51 HALL 9.51 HALL 9.51 DEDUCTION STUDYROOM 5.92 STUDYROOM 5.92 STUDYROOM 5.92 STUDYROOM 5.92 2.1 2.1 BEDROOM 7.77 BEDROOM 7.77 BEDROOM 7.77 BEDROOM 7.77 D-1 3.45 0.75 2.59 BEDROOM 7.77 BEDROOM 7.77 BEDROOM 7.77 BEDROOM 7.77 D-2 3.45 0.75 2.59 TOILET 2.87 TOILET 2.87 TOILET 2.87 TOILET 2.87 D-3 0.25 5.07 1.27 3.3 1.7 0.5 9.4 0.8 D-5 BAL3 BAL2 D-4 0.7 0 D-4 --> --> 2.59 0 11.4 D-5 3.45 0.75 2.59 CARPET AREA CALCULATIONS CARPET AREA CALCULATIONS 3.4 5.5 3.5 EXCLUDING OPEN BALCONY & TERRACES EXCLUDING OPEN BALCONY & TERRACES D-6 0.25 4.97 1.24 0.3 12.1 0.3 BALCONY CALCULATION IN SQ.MT SC(P)0 --> --> 7.08 FLAT NOS ROOMS AREA CARPET AREA FLAT NOS ROOMS AREA CARPET AREA MIXED BASEMENT COMMERCIAL AREA KEY PLAN SHOP-1 SHOP8 6.02 52.17 HS-1 HS8 6.21 50.1 PASS(P)0 --> --> 41.04 FLOOR SQ.M. NO. AREA SHOP7 6.2 HS7 6.4 STILTED GROUND FIRST 2.65x0.75 SECOND 1THIRD FLOOR 1.99 SHOP6 6.19 HS6 6.19 LIFT(R)0 1.5 1.5 2.25 2.1 2.65x0.75 1 1.99 SHOP5 6.26 HS5 6.26 TOTAL =63.23Sq.M 2.65x0.75 1 1.99 SHOP4 6.16 HS4 6.36 Open Balcony Deduction 2.65x0.75 1 1.99 SHOP3 6.16 HS3 6.36 TOTAL = 7.95 BAL0 2.65 0.75 1.99 SHOP2 6.16 HS2 6.16 SHOP1 6.18 HOUSEHOLDSTORAGE1 6.18 BAL1 2.65 0.75 1.99 TOILET 2.87 BAL2 2.65 0.75 1.99 BAL3 2.65 0.75 1.99 TOTAL =7.95Sq.M Total Deduction =71.18Sq.M Net BuiltUp Area=138.34Sq.M BACKLANE BUILT UP AREA CALCULATION 13.4 D-1 19.5 3.58 12.34 3.58 FOR BASEMENT RESIDENTIAL 15.5 3.58 3.58 SP AREA NAME LENGTH WIDTH Area(Sq.M) CP CP CP CP CP 3.58 3.58 BLOCK 11.45 15.5 177.47 SP BALCONY BALCONY W W2 D D W2 W (5.92Sq.m) (5.92Sq.m) W BLOCK AREA TOTAL =177.47Sq.M HOUSEHOLD STORAGE 1 SHOP1 W R/S 3.2 X 1.85 3.2 X 1.85 2 X 3.09 2 X 3.09 SP SP SP SP SP HALL HALL STUDYROOM STUDYROOM (6.18Sq.m) V0 (6.18Sq.m) SP D1 2.9 X 3.28 (9.51Sq.m) 2.9 X 3.28 (9.51Sq.m) D1 DEDUCTION V CP CP (6.33Sq.m) (6.33Sq.m) D TOILET 2.3 X 1.25 (2.87Sq.m) SP SP Bicycle 3.2 X 2.95 KITCHEN 2,7,10,14 D D 3,6,11,15 3.2 X 2.95 KITCHEN D-1 9.35 13.4 125.29 ROAD 9.0 M. WIDE W1 W1 D2 HS2 SHOP2 TOILET TOILET PARKING 2 X 3.08 2 X 3.08 2.30 X 1.25 D2 D2 2.30 X 1.25 (6.16Sq.m) V0 DN R/S (6.16Sq.m) SP SP SP Bicycle Bicycle V (2.88Sq.m) D1 D1 (2.88Sq.m) V TOTAL =125.29Sq.M SP SP PASS D LIFT 1.50 X 1.50 W BEDROOM 2.95 X 2.63 DN BEDROOM 2.95 X 2.63 W PROPOSED BUILDING Total Deduction =125.29Sq.M 2.1 2.1 (2.25Sq.m) (7.77Sq.m) (7.77Sq.m) SP Bicycle D SP SP 15.88 HS3 2 X 3.18 R/S SHOP3 2 X 3.08 (6.16Sq.m) SP SP LIFT 1.50 X 1.50 ON PLOT NO.69 Net BuiltUp Area=52.18Sq.M (6.36Sq.m) 24.54 V0 (2.25Sq.m) Bicycle Bicycle BEDROOM BEDROOM SP SP SP SP 2.1 9.3 W 2.95 X 2.63 2.95 X 2.63 W Bicycle D Bicycle (7.77Sq.m) (7.77Sq.m) Bicycle 11.4 SHOP4 Bicycle HS4 BicycleBicycleBicycleBicycleBicycle 2 X 3.18 2 X 3.08 SP SP SP SP D1 D1 R/S (6.36Sq.m) (6.16Sq.m) Bicycle (2.88Sq.m) (2.88Sq.m) D2 D2 2.30 X 1.25 V0 V 2.30 X 1.25 V Bicycle Bicycle Bicycle BicycleBicycleBicycleBicycle TOILET TOILET W1 D D W1 D SP SP KITCHEN KITCHEN HS5 D V0 V0 V0 SHOP5 BicycleBicycleBicycleBicycleBicycle BicycleBicycle 3.2 X 2.95 (6.33Sq.m) HALL 1,8,9,13 4,5,12,16 HALL 3.2 X 2.95 (6.33Sq.m) LEGENDS: 2 X 3.13 R/S 2 X 3.13 D1 2.9 X 3.28 2.9 X 3.28 D1 (6.26Sq.m) HS6 HS7 HS8 (6.26Sq.m) SHOP6 SHOP7 SHOP8 (9.51Sq.m) (9.51Sq.m) STUDYROOM STUDYROOM 3.1 X 2 3.2 X 2 3.11 X 2 3.1 X 2 3.1 X 2 3.01 X 2 (6.19Sq.m) (6.4Sq.m) (6.21Sq.m) (6.19Sq.m) (6.2Sq.m) (6.02Sq.m) 3.2 X 1.85 (5.92Sq.m) 3.2 X 1.85 (5.92Sq.m) PLOT BOUNDRY SHOWN WHITE D D D W MIXED R/S R/S R/S R/S W R.C.C. SLAB 0.10M PROPOSED WORK SHOWN RED W W2 D D W2 W T- 0.25M R- 0.18M PARAPET WALL 1.06M. . DRAINAGE LINE SHOWN YELLOW LIGHT BALCONY BALCONY WATER LINE SHOWN BLUE DOTTED R.C.C. SLAB 0.10M ENCLOSED BAL SHOWN BROWN 5.08 5.08 2.75 TERRACE SHOWN DARK YELLOW OPEN BAL SHOWN BRAWN 2 7/8" 4F EXSTING SHOWN BLUE HATCHED 1.50 M ROAD WIDENING HAND OVER TO D.M.C PLOT 9.0M WIDE ROAD 2.75 CERTIFICATE OF AREA 15 M WIDE CERTIFIED THAT THE PLOT UNDER REFERENCE WAS 2 7/8" 3F D.P. ROAD SERVEYED BY ME ON -- / / AND THE DIAMENSIONS OF SIDES etc. OF PLOT 15.0M WIDE ROAD ROAD 12 M. WIDE STATED ARE MEASURE ON SITE AND THE AREA SO WORKED OUT TALLIES WITH 2.75 STILTED GROUND FIRST SECOND THIRD FLOOR BASEMENT GROUND FLOOR THE AREA STATED IN 2F DOCUMENT OF OWNERSHIP / T.P SCHEME RECORD / LAND RECORD / CITY SURVEY RECORDS. 2 7/8" 1'-2 7/8" 2.75 1.50 M ROAD WIDENING 2.75 NAME OF DEVELOPER: PARAG SUBHASH AHIRE Address - DHULE 1F Plot No - 69 2 7/8" Phone No. - 9422789496 N 2.4 DESCRIPTION OF PROJECT : 0F PROPOSAL NO.- 1 0.9 G.L Plinth 2 5/8" PROPOSED MIXED 3 BUILDING ON CTS. NO./SURVEY NO.- 14 MIXED SECTION VIEW PARKING LVL. 1.22 G.L. G.L. 7/8" TAL. DHULE MUNICIPAL CORPORATION -1F NAME OF ARCHITECT: ER PARAG AHIRE 1.20 SCHEDULE OF OPENING: 3" LIFT PIT LOGO OF ARCHITECT ADDRESS OF OFFICE NAME LENGTH HEIGHT NOS. OFFICE : DHULE D 1 2.1 17 D1 0.90 2.10 8 OWNERS SIGN: ARCHITECTS SIGN: D2 0.75 2.10 5 PARKING STATEMENT MANHOLE TENAMENT PARKING NO.OF REQUIRED PROPOSED FREE BOARD SUMP WELL 18000 LITRES CAPACITY. SCHEDULE OF OPENING: AREA RATIO TENA. PARKING PARKING INLET BAFFLE OUTLET BK.WALL WATER STORAGE REQUIREMENT NAME LENGTH HEIGHT NOS. FOR 3 TENA. BETWEEN 40 TO 80 S.MT. 1:4:4 1 1:4:4 -- M.S.GATE P.C.C. SECTION THROUGH OVER HEAD WATER TANK REQUIRED 17 TENAMENT = 16X 5 PERSON X 135 Ltr. PREMIUM STATEMENT SCALE: 100 CROSS SECTION U. WATER TANK. = 10800 Ltr. V 0.60 1.20 5 FOR 4 TENA. BELOW 40 S.MT. P.C.C.COPING COMMERCIAL = 1 PERSON X 45 Ltr. S.NO. DESCRIPTION AREA SCALE 1:100 100 1:5:5 16 4:20:20 -- VENT PIPE .23 thk.BK.WALL = 45 Ltr. 1.50 0.25thk.BK.WALL W 1.80 1.20 12 MIXED FOR EVERY 80 SQ.MT. GL. MANHOLE UNDER GR. WATER TANK REQUIRED 1. TOTAL PAID F.S.I. CONSUMED 166.98 1:4:4 55.69 1:4:4 -- ST_WID .45 thk.STONE WALL. = 10845 Ltr. X 1.5 = 16267.5 Ltr. JOB No. JobNO chkby W1 1.6 1.2 4 VISITOR PARKING (5%) P.C.C. STUDY OUTLET PROPOSED - O.H.W.T = 11000 LTS. 2. TOTAL ENCLOSED BALCONY 0 0:0:0 0 1:2:2 -- COMPOUND WALL PLAN OF UNDERGROUND U.G.W.T. = 17000 LTS. INLET W2 1.65 1.2 4 DETAIL ST_LEN WATER STORAGE TANK 3. TOTAL PROPOSED TERRACE 0 TOTAL 7:30:30 7:30:30 SCALE: 100 SEPTIC TANK DETAIL SCALE: 100 SCALE: 100 S U B M I S S I O N D R A W I N G